electrical grid

Utilities is a division of Facilities & Operations, made up of 135 dedicated employees responsible for providing utilities services for the university 24 hours per day, 365 days per year. Services include campus-wide utilities purchasing, generation, and distribution, as well as metering and billing energy consumption for all university buildings. Distribution includes the operations and maintenance of 300 miles of underground utility systems from outdoor lighting and high voltage circuits to water mains to tunnel piping. The division also provides a wide range of engineering services primarily dedicated to energy management, the operations and maintenance of university facilities, and the utilities infrastructure.

Brian Hall
Interim Director
Utilities
1110 E. Huron
Ann Arbor, MI 48104-1631
Phone: (734) 764-2492
Fax: (734) 647-0967

The Utilities division is made up of the following units:

Central Power Plant

The Central Power Plant (CPP) generates and processes four main services to the University of Michigan Central and Medical Campuses, which are:

  • Steam
  • Electricity
  • Compressed air
  • Domestic hot water

The CPP is a combined cycle cogeneration power plant which includes seven steam boilers totaling 1,000,000 pounds of steaming capacity and 46 megawatts of electric generation capacity. The CPP team operates and maintains the facility to ensure we are compliant with the federal, state and local Environmental & Safety regulations. We are a proactive team who strive for continuous improvement by applying the Facilities and Operations principles of being Respectful, Collaborative, Solutions-Based and Proactive into our daily work.

NCRC Central Energy Plant

The Central Energy Plant is located in Buildings 80, 85, 86, and 800 on the North Campus Research Complex. The 2.7 million square foot campus is composed of office, research and vivarium space, which the CEP supplies with steam, chilled water and electricity. 

  • 305,800 pounds per hour of boiler steam capacity
  •  20,360 tons of chiller capacity
  •  11.8 Megawatts of electrical generation

Electrical Operations

Electrical Operations (EO) is part of The University of Michigan Utilities Department. EO consists of the Primary Systems Electrical Shop, the Power & Lighting Electrical Shop and the Electrical Utilities Engineering Group.

猎豹加速器,连接你我:当您在海外观看CCTV,爱奇艺,腾讯视频,网易云音乐,B站等国内视频和音乐资源遇到网络区域限制的时候,猎豹加速器可众帮你解决所有网络限制,无忧的访问中国网络资源。

  • Master planning to ensure the electrical system capacity supports future University growth
  • Planning to provide reliable power to new buildings, additions, and renovations in an economical manner
  • Operating, installing, testing, upgrading and maintaining the campus wide primary voltage electrical distribution system
  • Planning, maintaining, upgrading, and replacing building unit substations
  • Planning, maintaining, upgrading, and replacing outdoor lighting systems
  • 小科普 | 用这些“油猴”拓展,给你的浏览器加个BUFF!_值客 ...:2021-6-13 · 小科普 | 用这些“油猴”拓展,给你的浏览器加个BUFF!,由什么值得买值友发布在好物社区的真实分享,本文是作者亲身的购买使用感受众及中立消费见解,旨为在广大网友中传播更好的消费主张。
  • Providing electrical systems support to the Utilities Outlying Boiler and Tunnel Shops
  • Accurately monitoring building electrical consumption and approving electrical utility billing charges
  • Collaborating with AEC, UPO, Michigan Medicine and other departments to promote consistency of electrical installations
  • Collaborating with the Office of Campus Sustainability and other departments to promote electrical energy conservation and meet the University’s sustainability goals

We appreciate your interest, if you have any questions, comments, requests, or concerns please contact:

Brian Hall
Interim Director
Office Location: 1110 E. Huron
Ann Arbor, MI 48104-1631

Utilities Distribution

Utility Distribution Systems consists of Outlying Boilers, Tunnel Systems, and Water Distribution Systems.

  • 【LinkCN|LinkCN官网】助海外华人访问国内应用,国服超低 ...:LinkCN官网提供:LinkCN加速 海外华人访问国内网络,免费试用! LinkCN支持海外王者荣耀、吃鸡手游等加速,玩国服游戏降低延迟;LinkCN支持海外看爱奇艺、腾讯视频等,玩游戏,看视频,听音乐就 …
  • The Tunnels crew operates and maintains roughly 6 miles of underground structures that house low pressure steam, high pressure steam, domestic hot water, condensate, and compressed air systems
  • The Water Distribution team operates and maintains roughly 120 miles of domestic water, sanitary, and storm water piping systems

Outlying Boilers
Outlying Boiler Services (OBS) provides operations and maintenance services for small to medium sized heating boilers and large domestic water heaters in over 100 University buildings throughout the Ann Arbor campus area. The bulk of the OBS buildings are General Fund facilities, with the largest concentration on the North Campus. Most of the buildings in the Central Campus area are served from the Central Power Plant rather than OBS.

Skip to content
白鲸加速器,松鼠助手,蚂蚁加速npv下载,免费加速神器vpm  bitz交易所官网,bnet官网下载,bitz交易所官网登录,bitz官网下载  安卓软件,安卓加速软件,安卓加速器,cisco加速器电脑版下载  夏时加速器官网,夏时加速器安卓下载,夏时加速器2024,夏时加速器不能用了  泡芙云安卓下载,泡芙云vnp,泡芙云跑路了,泡芙云vpm  v2rayng安卓下载下载地址,v2rayng安卓下载npv,v2rayng安卓下载vqn,v2rayng安卓下载vps  飞机软件下载安卓在线下载,飞机软件下载安卓版,飞机软件下载中文版,国外飞机软件下载  加速器器破解版,加速器器下载,加速器器免费破解版,迅游加速器